Enhanced TDS
Identification & Functionality
Features & Benefits
- Labeling Claims
- Ready-to-Use Product Features
Applications & Uses
- Markets
- Applications
- Application Area
- Application Method
- Compatible Substrates & Surfaces
- Cure Method
- Application Instructions
The bonding should occur immediately after the application. Initial adhesion and strength build of HP008 is excellent and the bonded materials can be used for further processing shortly after leaving the assembly area.
Processing temperatures: Roll coater 245-255°F (118-124°C) Hot melt gun 245-255°F (118-124°C)
To clean, first remove as much molten material as possible from the line or coater. Then flush or clean the unit with the proper purge or a product that is recommended by the equipment manufacturer. Cleaner is available in the form of Ever-Lock® 2U233 purge for hot melt guns and nozzles and Ever-Lock® 2U373 for roll coater applications.
Properties
- Color (Properties)
- Physical Form
- Appearance
- Off white liquid
- Material Specific Properties
Value Units Test Method / Conditions Roll Coater Open Time 45 - 60 s - Solid Content 100.0 % - Green Strength Build (at 30s) min. 50 psi - Tensile Strength 2500.0 psi - Elongation at Break 250.0 % - 2% Secant Modulus 2000.0 psi - - Rheological Properties
Value Units Test Method / Conditions Viscosity (at 250°F) 8,000 - 11,000 cP - Application Temperature 300 - 350 °F -
Packaging & Availability
- Regional Availability
Storage & Handling
- Shelf Life
- 3 Months
- Storage Conditions
- In original sealed packaging protected from sun, dust, moisture and high temperatures.
- Store under clean and dry conditions at constant room temperature.