Enhanced TDS
Identification & Functionality
- Chemical Family
- Product Type
- Technologies
- Product Families
Features & Benefits
- Ready-to-Use Product Features
Applications & Uses
- Application Method
- Compatible Substrates & Surfaces
- Instructions
Bonding surface preparation: The bonding surface needs to be clean, dry and oil-free
- Polyolefin materials must be subjected to electrical or oxidation pretreatment.
- Such materials must be pre-treated with a suitable cleaning agent or primer.
Preparation: unloader, heating plate, delivery pipe, pump, and gun head must be equipped with
- Set the appropriate temperature. Too high a temperature will cause the glue to decompose.
- The structure of the equipment, heating plate, conveying pipe and pump are set to a temperature within 180 enough.
When applying with a nozzle or roller, bonding must be done immediately.
- Cold will cause the glue to peel off and greatly shorten the opening time.
- It is recommended to preheat the substrate.
It is recommended to use it all at once after opening the package.
Properties
- Physical Form
- Typical Properties
Value Units Test Method / Conditions Viscosity (27#, at 130°C) 10000.0 mPa.s Brookfield BF DV-11 Glue Coating Thickness max. 0.3 mm - Recommended Operating Temperature 175 - 180 °C - Recommended Glue Temperature (For Roller Coating ) 130.0 °C - Recommended Tank Temperature (For Spraying) 120.0 °C - Recommended Tank Temperature ( For Spraying , throat) approx. 170 °C - Recommended Tank Temperature ( For Spraying , nozzle) approx. 180 °C -
Technical Details & Test Data
- Curing Conditions
In order to achieve complete curing, the composite product should be stored at a suitable temperature and humidity (for example: 25 temperature and 50% RH humidity, or If the film thickness is 0.5 mm or less, under suitable conditions at low temperatures and humidity, the curing will be completed within 7 days. It takes a long time to fully cure. The curing rate and completion of curing will vary with the film. Varies depending on thickness and substrate permeability.
Storage & Handling
- Shelf Life
- 6 - 12 months
- Storage Conditions
- Keep in a closed container away from direct sunlight.
- Validity period: 6 months for composite aluminum foil bag; 9 months for drum; Install for 12 months.